Reclamation, Engineering

Project Descriptions

For the development of the Karimun Islands as an Industrial zone with important tank storage capacity, a high level presentation of possible alternatives to local authorities was foreseen by the Client. To support the presentation and to visualize possible future developments, high-level drawings showing the phased development of the islands were required.

_____

Client: PT Arya Magentra

Location: Karimun, Indonesia

Period: 2011

Services: Preparation of conceptual drawings for phased development of tank farm, refinery and industrial areas.

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

Miscellaneous Liquids Terminal

Project Descriptions

A new marine terminal for chemicals, lube oil, vegetable oil and LPG. The terminal consists of a new jetty, marine loading arms, hose tower, pipeline systems, vegetable oil tanks and truck loading facilities and utilities

_____

Client: Aqaba Development Corporation

Location: Aqaba, Jordan

Period: 2009-2010

Services: Master plan, conceptual design and basic design for the jetty, jetty top side equipment and a tank terminal

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

Tank Farm & Tariff Calculation Consultancy Services

Project Descriptions

In this first phase CRH was gather all relevant information and propose the utilities required for the new tank area. Then a New Master Plan of the new tank farm, extension of jetty piperack and new liquid berth will be developed and tariff calculation work (The IRR methodology).

_____

Client: IRPC Public Company Limited

Location: Rayong, Thailand

Period: 2010

Services: Lay out design of tank farm, Cursory design of tanks pipelines, civil works, mechanical & electrical design, process control & operation, Estimate of investment and operational costs, Financial analyses of feasibility of different expansion projects, New marine loading arms and possibly a new jetty for servicing the new products, Advise the tariff strategy for the new customer in short term and term contract as well as service level agreement

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

Complex – Seaport

Project Descriptions

Long Son Petrochemical Company (LSP) is a joint venture between Siam Cement Group of Thailand, Qatar Petroleam and Petrovietnam. LSP intends to develop a worldclass petrochemical plant on Long Son Island located in the Ba Ria-Vung Tau Province, south of Ho Chi Minh City in Vietnam. For import of feedstock for the plant and for export of products a seaport facility is required. Royal Haskoning (RH) and C-RH were appointed by LSP in June 2010 to carry out consultancy services related to the feasibility study, basic design and local environmental impact assessment for the seaport.

_____

Client: Long Son Petrochemical Company

Location: Vietnam

Period: 2010-2011

Services: Feasibility, Concept Design on jetty topside structures

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

Jurong Port LBT Singapore Concept Design

Project Descriptions

New tank storage terminal to replace existing container termina on Jurong Island. Development of initial concepts based on the characteristics of the 20-hectare plot of land. Evaluation of concepts and highlighting overall benefits and potential drawbacks.

_____

Client: Noble Group

Location: Jurong, Singapore

Period: 2011

Services: Preparation of Technical Plan, Concept design and 3D visualisation

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

Tank Terminal Europoort West

Project Descriptions

Conceptual design support for tender bid for new $1 bln tank storage terminal in Rotterdam. More than 3 million m3 storage capacity for crude oil and products.

_____

Client: VTTI

Location: Rotterdam, The Netherlands

Period: 2011

Services: Conceptual design, technical bid preparation

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

New Refined Oil Storage Depot

Project Descriptions

Act as the Owner’s Engineer in engaging with the appointed EPC contractor, Cakasa Engineering, in Nigeria in reviewing designs and resolving design queries on behalf of the owners during the conceptual and detailed engineering design phases.

_____

Client: Arcadia Al Arabiya DMCC

Location: Calabar, Nigeria

Period: 2010-2011

Services: Preparation of Basis of Design, Review of detailed design prepared by EPC contractor, Technical Consultancy

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

Food Factory

Project Descriptions

Chuchawal Royal Haskoning developed the conceptual design

_____

Client: Cerebos (Thailand) Ltd.

Location: Thailand

Period: 2007

Services: Architectural Design, Structural & Civil Design, M&E Designs (Electrical, AC &Vent., Sanitary, Fire Alarm &Fighting System), Value Engineering, Engineering Support during Construction

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

Poultry Processing

Project Descriptions

A new poultry processing plant with a production capacity of 540 Tons per week. The plant is designed for 5 processing lines, consisting of:

  • 5 tumblers (batch process)
  • 5 preparation lines (battering, coating, etc.)
  • 5 frying lines
  • 5 steam cookers
  • 5 IQF freezers
  • 2 Multi-head weighers
  • 4 manual primary packaging lines
  • 6 secondary packaging lines

The new processing plant will accommodate 1,200 processing staff.

_____

Client: Golden Foods Siam Ltd.

Location: Nakorn Nayok, Thailand

Period: 2009-2010

Services: Design, Project Management, Construction Management

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

Expansion of Admin. & Lab, Car Park Building

Project Descriptions

An expansion within the administration block of their existing facilities in Maptaphut Industrial Estate, Rayong, Thailand. The desired buildings consist of two buildings which will be designed at the same time but construction period may be different.

The 1st building is the upgrade and expansion of the existing Admin Building. The current building will be modified to accommodate the new entrance with rain cover and expanded to provide a large conference room and small office space on the ground floor or first floor; large office space for various functions and a number of small meeting rooms on the second floor.

The 2nd building is the new ATC Laboratory Building. It will have laboratory on the ground floor and office area plus small meeting rooms on the second floor.

_____

Client: Dow Chemical Thailand Limited

Location: Rayong, Thailand

Period: 2013

Services: Designs, Project Management, Construction Management 

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com