FACTORY & WAREHOUSE

Project Descriptions

2 stories building functioning first floor for show rooms, warehouse and second floor for offices, assembly area.

__________

Client: Ruwac Asia

Location: Amata Nakorn, Thailand

Period: 2010-2011

Size: 2,000 sq.m. 

Services: Feasibility Study, Design, Project Management, Construction Management

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

FLOOD RISK ASSESSMENT, CONCEPTUAL & DETAILED DESIGN FLOOD PROTECTION

Project Descriptions

Analysis of the flood risks for Pathumthani Plant of ThaiNamthip resulting in design elevations and other requirements. Conceptual designs of flood risk reduction solutions for flood protection including drainage / pumping for ThaiNamthip’s facilities.

For the facility in Pathumthani the conceptual design was further developed in a detailed design. 

_____

Client: ThaiNamthip Limited

Location: Pathumthani, Thailand

Period: 2012-2013

Services: Site Analysis, Flood Risk Assessment, Conceptual design of flood protection solutions and drainage, Detailed design of flood protection solutions and drainage

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

CAN MANUFACTURING FACTORY

Project Descriptions

A new factory at Rojana Industrial Park. The project consists of:

  • A two storey building
  • Small facilities buildings such as lockers area

_____

Client: Soonthorn Metal Can Co., Ltd.

Location: Ayuthaya, Thailand

Period: 2008-2009

Size: 10,000 sq.m. 

Services: Architectural design, structural, civil design, mechanical and electrical designed works, project management and construction management

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

SEAFOOD PROCESSING PLANT

Project Descriptions

A new processing facility in Samut Sakorn Province, consisting of several processing plants for tuna, sardines and shrimps.

_____

Client: Thai Union Frozen Products PCL.

Location: Samut Sakorn, Thailand

Period: 2009-2010

Services: Design, Project Management, Construction Management

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

HYGIENIC FLEX PHASE 2 PROJECT

Project Descriptions

The expansion of the existing plant no. 2 of Huhtamaki which is located in Samutsakorn Industrial Estate. This new building of 9,000 sq.m. construction area is a 3 storey building composing of:

  • Ground floor for manufacturing process, finished goods warehouse and raw material warehouse.
  • Second floor for offices.
  • Third floor for canteen, indoor badminton courts, and future solvent receiving areas.
  • Relevant external works such as modified RC pavement and drainage system, manholes & handholes for of electrical works etc.

_____

Client: Huhtamaki (Thailand) Limited

Location: Samutsakorn,, Thailand

Period: 2014-2015

Size: 9,000 sq.m. 

Services: Design, Project Management, Construction Management

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

HEAVY TRUCK RAIL MANUFACTURING FACILITY

Project Descriptions

Modifying a leased existing building, which has been built as a standardized
block of building by Hemaraj Industrial Estate, to customize for the operations
of Metalsa.

_____

Client: Metalsa (Thailand) Co., Ltd.

Location: Rayong, Thailand

Period: 2012

Size: 6,000 sq.m. 

Services: Design, Project Management, Tendering, Construction Supervision

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

PRODUCTION AND DISTRIBUTION CENTER FOR LENS MANUFACTURING PLANT

Project Descriptions

New production building for the lens manufacturing plant.  Special features included the clean rooms and high efficiency air handling system.

Distribution center building for lens finished goods with high efficiency fire fighting system.

 

_____

Client: Essilor Lens Manufacturing Plant

Location: Bangkok, Thailand

Period: 2003

Size: 10,000 sq.m. 

Services: Design, Project Management, Construction Management

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

PROFESSIONAL LAUNDRY PRODUCTION FACILITY

Project Descriptions

A production facility for professional laundry as well as food services and a warehouse for Electrolux’s regional logistic needs were constructed based on an overall master plan developed by Chuchawal Royal Haskoning.  The production facility incorporates also offices, showroom, locker rooms and a canteen

 

__________

Client: Electrolux Thailand Co., Ltd.

Location: Rayong, Thailand

Period: 2004

Size: 10,000 sq.m. 

Services: Design & Interior, Project Management, Construction Management

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

BEVERAGE CAN EXPANSION CAN LINE 3-FACTORY BUILDING 3

Project Descriptions

A production facility adjacent to its existing factory situated at Siam Cement Industrial Land, Nongplakradee Road, Nong Pling Subdistrict, Nong Khae District, Saraburi Province, Thailand. The facility consists of 2 main areas, production area and warehouse area.

__________

Client: Thai Beverage Can Ltd.

Location: Saraburi, Thailand

Period: 2012

Size: 20,000 sq.m. 

Services: Design, Project Management, Construction Management

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com

EUROPEAN TIRES MANUFACTURING

Project Descriptions

The Project is located on an available land inside the LMC existing factory in Laem Chabang. 

_____

Client: 

Location: Laem Chabang, Thailand

Period: 2014-2015

Size: 5,000 sq.m. 

Services: Design, Project Management, Construction Management

_____

Chuchawal Royal Haskoning

+66 2 259 1186-9  info@chuchawalroyalhaskoning.com